What is sub base and base course?

What is sub base and base course?

Base courses are usually constructed out of crushed aggregate or HMA. Subbase Course. The layer between the base course and subgrade. It functions primarily as structural support but it can also minimize the intrusion of fines from the subgrade into the pavement structure and improve drainage.

What is base course asphalt?

The base course is the lower asphalt course (or courses), below the surface and any leveling course. The base course provides the strength of the pavement and typically has an aggregate top size of 3/4 to 1 inch. Tack / Prime Coat. The tack or prime coat is a spray applied application of emulsified asphalt.

What are the layers of rigid pavement?

The structure of a rigid pavement consists following layers.

  • Concrete slab or surface course.
  • Granular base or stabilized base course.
  • Granular subbase or stabilized subbase course.
  • Frost protection layer.
  • Subgrade soil.

What is the purpose of base course?

Under rigid pavements, the base course is used to: (1) provide uniform and stable support, (2) minimize damaging effects of frost action, (3) provide drainage, (4) prevent pumping of fine-grained soils at joints, (5) prevent volume change of the subgrade, (5) increase structural capacity of the pavement, and (6) …

What is base layer in pavement?

The base course or basecourse in pavements is a layer of material in an asphalt roadway, race track, riding arena, or sporting field. It is located under the surface layer consisting of the wearing course and sometimes an extra binder course.

What is Sub base course?

The subbase course is typically a granular borrow that is placed between the base and subgrade. It can be constructed as either a treated or untreated layer. Untreated or unbound aggregate subbase layers are characterized in a manner similar to the subgrade in pavement design.

What is Type 2 Sub Base?

Our Type 2 is a crushed aggregate with extra dusts and fines, which makes the perfect sub base for a range of domestic and commercial construction projects. Graded to 50mm down to dust and fines no specified grading, it is finer than our MOT Type 1 sub base, as it is composed of fewer larger angular scalpings.

What is base course material?

What is the base course made of?

asphalt concrete
Base Course This is a type of asphalt that gets its strength and load-spreading capability from the interlocking aggregate skeleton (asphalt concrete). This is the principle structural layer that receives the loads from surfacing and provides most of the strength and load distributing properties of the road pavement.

What is a sub base course of rigid pavement?

Sub Base Course of Rigid Pavement. This is the layer (or layers) under the base layer. The properties and function of this layer are similar to those under flexible roads/pavements. A sub-base is not always needed and therefore may often be omitted.

What is the construction process of a rigid pavement?

The construction of a rigid pavement is a fairly complex process. It involves many processes, including proper preparation of the subgrade and base, placing reinforcing bars or dowels, choice and handling of aggregates and other materials, development of concrete mix design, production and transport of the concrete, and placing,…

What is the purpose of base course in pavement?

Base Course of Rigid Pavement This is the layer directly below the PCC layer and generally consists of aggregate or stabilized sub-grade. It provides additional load distribution, contributes to drainage, uniform support to the pavement and a stable platform for construction equipment.

What is the typical performance period of a rigid pavement?

For rigid pavements, the initial pavement structure shall be designed and analyzed for a performance period of 30 yr. A performance period other than 30 yr. may be utilized with justifications. For example, an existing pavement to be widened will be completely reconstructed within 15 yr.