How many gates are there in Almatti Dam?
Almatti Dam, Bijapur
| QUICK FACTS | |
|---|---|
| Length | 1,565.15 meters |
| Height | 23.31 meters |
| Length of spillway | 486.50 meters |
| Number of gates | 26 |
In which river is Almatti Dam?
the Krishna River
The Almatti Dam is a dam project on the Krishna River in North Karnataka, India which was completed in July 2005. The annual electric output of the dam is 713,000,000 kilowatts (KW).
Where is Lal Bahadur Shastri Sagar?
Alamatti Dam also known as Lal Bahadur Shastri dam is one of the most important dam projects in Karnataka state built across the Krishna River. It is considered as a new dam, since the construction of this dam was started in the year 2005.
How many gates are there in Narayanpur dam?
30
Basava Sagar Dam or Narayanpur Dam, Yadgir
| QUICK FACTS | |
|---|---|
| Number of gates | 30 |
| Filling period | From June to November |
| Depletion period | From November to May |
| Projects | Upper Krishna project |
What is the capacity of Almatti Dam?
The composite Dam at Almatti which is 1564.83 M in length and 52.25 M in height with a gross storage capacity of 42.19 TMC will submerge an area of 24230 ha.
Why is Almatti Dam called Lal Bahadur Shastri?
The Lal Bahadur Shastri Dam is also known as Almatti Dam is a hydroelectric project on the Krishna River in North Karnataka, India which was completed in July 2005. The target annual electric output of the dam is 560 MU (or GWh)….Almatti Dam.
| Lal Bahadur Shastri Dam | |
|---|---|
| Impounds | Krishna River |
| Height | 524.26ft |
| Length | 1565.15 ft |
| Reservoir |
Who is the engineer of Almatti Dam?
| Designation | Name | Address |
|---|---|---|
| Chief Engineer | Sri. M.S.Vagmore | KBJNL,Dam Zone, Almatti |
| Superintending Engineers | Sri. V.K.Potadar | KBJNL,Dam Circle, Almatti |
| Executive Engineer | Sri.V.V.Sheeri | KBJNL,Dam Division, Almatti |
| Assistant Executive Engineer | Sri.P.H.Mayginmani | KBJNL,Dam Sub-Division No.2, Almatti |
Who built Almatti dam?
KPCL
KPCL eventually completed the project at an even lower cost of Rs. 5.20 billion. The entire dam was finished in less than forty months, with construction ending in July 2005. The dam is located on the edge of Bijapur and Bagalkot districts.