How many stages are there in the RIBA Plan of Work 2013?
eight stages
The RIBA Plan of Work 2013 consists of eight stages defined by the numbers 0–7, and eight task bars as illustrated in Figure 2.
What is RIBA Plan of Work 2007?
The first detailed plan of work was published in 1964 (ref. Introduction, RIBA Plan of Work 2007). Split into a number of key project stages, the RIBA Plan of Work provides a shared framework for design and construction that offers both a process map and a management tool.
What are the 7 stages of riba?
Stage 1 was Preparation and Brief but has been renamed Preparation and Briefing; Stage 3 was Developed Design – it’s now Spatial Coordination; Stage 5 was Construction and is now Manufacturing and Construction; Stage 6 was Handover and Close Out and is now just Handover; and Stage 7 was gone from In Use to Use.
What are the RIBA work stages?
The RIBA Plan of Work organises the process of briefing, designing, delivering, maintaining, operating and using a building into eight stages.
What is Stage 4A RIBA?
RIBA Stage 4A: Technical Design. RIBA Stage 4B: Technical Production Information. RIBA Stage 4C: (former G to H) Tender, Programme. RIBA Stage 5: Construction (on site phase) RIBA Stage 6: Handover.
What is Stage 4 of the RIBA plan of work?
Stage 4: Technical Design By the end of this stage the architectural, structural and mechanical services design and specifications should describe all main components of the building and how they fit together, and any performance specified work should be defined.
What is Stage 4A Riba?
What happens in Stage 0 of riba?
The 2020 Edition of the Plan of Work suggest that ‘Stage 0 is not about design or the practical details. It focuses on making the right strategic decisions and capturing them in a Business Case.
What is a Stage 4 drawing?
Stage 4. Technical Design is a refinement of the existing design, essentially preparing the necessary drawings and documentation for tendering. It often involves approaching relevant specialist subcontractors, such as a glazing manufacturer, or joinery firm.
What is included in RIBA Stage 4?
RIBA Phase 4: Detailed Design (DD)
- All architectural contractors.
- Previous designs and notes.
- Structural information.
- Building services information.
- Any design for specialist subcontractors and specifications.
What is RIBA Stage 4 technical design?
What is Technical Design? Technical Design, also known as Production Information or Construction Drawing Packages, is a suite of drawn information prepared by the Design Team and issued to the Construction Team to enable the project to be built (RIBA Stages 4-6).
What is a Stage 3 design?
Project Process Map. The design drawings and outline specification will be developed in consideration of the proposed phasing of works (if any) and the buildability strategy for the project.